Hoisting and installation of a new flare tip to restore optimal operating conditions and ensure full diversion of the production entering the SJOC.
← Volver a proyectos
Sección 02 · En operación
Flare tip restoration · San Joaquín Operating Center
750
MMPCD
01
nodo estratégico
Hoisting and installation of a new flare tip to restore optimal operating conditions and ensure full diversion of the production entering the SJOC.